On Friday Rockys Solar flipped the switch on a new solar installation at Longford in Gippsland.
The sun peaked through the clouds right at the perfect time for us to show our excited clients just over 10kW being produced through their new ABB inverter connected to 34 Jinko solar panels installed in 2 rows on their shed roof. The 3 phase system took two days to install. Our clients are very happy with the results and look forward to receiving their next energy bill.
Leave a Reply